News
Home  >  News
Release date:
10/22/2019
Font size
Jereh Launches World’s First 7000HP Electric Frac Pumper

Yantai/October 21st, 2019/ Jereh self-developed 7000HP electric frac pumper rolled off the production line and passed simulation test successfully.

 

As the world’s very first 7000HP electric frac pumper, it marks Jereh’s major breakthrough in the field of well service equipment R&D and manufacture. It will greatly enhance operation efficiency and promote the effective and intelligent shale gas development.

 

 Jereh Launched World’s First 7000HP Electric Frac Pumper


In 2018, China’s oil dependency and natural gas dependency climbed to 69.8% and 45.3% respectively, which leaves a threat to the nation’ s energy security.

 

As a consequence, Chinese government has set a goal to achieve shale gas production of 30 billion m3 by 2020.

 

China’s shale gas reserves are mainly buried in Mountainous Sichuan and Chongqing, where have winding roads, complicated geological conditions and dense population.

 

Therefore, it is important to develop equipment applicable for high-power, long-time and low-noise operation. The 7000HP electric frac pumper is specifically designed to cater to this situation.

 

Jereh 7000HP plunger pump debuted on cippe 2019 in March.


As the core of electric frac pumper, Jereh 7000HP plunger pump debuted on cippe 2019 in March, where it attracted lots of attention from industry experts and clients.

 

Equipped with the world’s highest-power plunger pump, the electric frac pumper is leading the global trend of fracturing equipment.

 

Apart from its high power and excellent efficiency, it also features a compact structure, which makes it more flexible for transportation in mountainous areas.

 

Lubricating and cooling system are upgraded with less noise during continuous operation.

 

Powered by electricity rather than diesel fuel, it eliminates the emission of waste gas and reduces energy consumption, making it more cost-effective and environmentally-friendly.

 

Now, the plunger pump has passed multiple tests, and runs stably under different pressure and revs, so that a longer service life is available.

 

Jereh is going to keep focusing on the R&D of intelligent equipment and the challenges our customers face. In this way, Jereh will support the development of shale gas industry, eventually secure national energy security.