News
Home  >  News
Release date:
08/27/2015
Font size
Jereh Looks at Boosting Colombian Oil & Gas Market

August 26, Jereh Group showed at the 16th International Petroleum Conference & Exhibition 2015 in Corferias, Bogota.

As one of the top four important petroleum conference in Latin America and the largest in Colombia, the exhibition provides the industry professionals a platform to share ideas to advance local oil and gas operations. Also the new technology, new product launches are showcased from around the world.

At the event, Jereh presented series of oil and gas solution from well drilling, stimulation to natural gas gathering and liquefaction, which aims to boost the local industry development.


Jereh Presents at ACIPET 2015

Micro-LNG Solution

At the show, Jereh’s Playwell Micro-LNG Solution stood out with its high competitiveness and flexibility. Aiming at solving the challenges of long delivery time, complex design and low economic efficiency, the specially designed solution provides four standardized design with capacity from 1.0 to 6.0mmscfd. Mr. Jim Wang, Manager of Jereh Colombian Branch said, “modular fabrication, intelligent remote control as well astimely services, ensures a much shorter project cycle could be promised with higher economic return secured. In 2014, Jereh contracted China’s first shale LNG plant in Sichuan and finished the project within only 27 weeks which enjoys remarkable returns now.”

In addition, Jereh Drilling Solution & EPC Services are also displayed with operation cases onsite, which offers a better way out for those who are struggling to increase production. With Jereh Colombian Branch set up in 2014, Jereh is dedicated to providing more timely and satisfying support to the local oil and gas market.

Find more about us via www.jereh.com/ or contact “Jereh Group” in LinkedIn.